well flooding meaning in Chinese
水井吸洪
Examples
- At last the fuzzy analysis model that consider on the flood control risk of reservoir and benefit was formulated and a better flood limit water level was chosen
最后构造了考虑水库防洪风险和兴利效益两个目标的模糊分析模型,优选了汛限水位。 - At the basis of analyzing the present situation of flood system and the necessity of system building , combining with the principle of uniting theory with practice , and from the angle of exploiting and utilizing water resources as well flood control and drought resistance , as a essay of a postgraduate , this article places stress upon researching and probing into following aspects : 1 . real - time flood forecasting and reservoir operation system design
笔者参与了系统总体框架设计,结合郁江流域实际情况,对南宁以上流域产汇流规律进行了研究,重点解决了该流域洪水预报模型参数的率定、实时校正模型的选用及洪水预报、实时校正和水库调度等模块耦合中的主要技术问题。